We have FINALLY made a start on the tiling. All the full tiles have been laid and the cut tiles have been cut ready for bedding in. By the end of tomorrow we should have a lovely new bathroom floor. We have also completed all the painting in the bathroom. And we some how managed to get the vanity up the stairs over the weekend. Damn thing weighs as much as a car, so hopefully when we put it on the new tiles it doesn't go straight through them. We have updated the pictures so have a look and you'll see the start of the new floor.
Monday, 6 December 2010
December 6, 2010
After a short break, we are back in full swing. I collected the doors for the bedrooms and the spiffy new sliding door for the bathroom last week. The new blinds for the bedroom also arrived a few days later. So it was with much excitement that we spent most of the weekend painting and sanding doors. We managed to put the blinds up on Saturday night and constructed the bed frame. The doors for the second bedroom went up yesterday, as did the sliding door for the bathroom. So with the second bedroom 99% complete we have officially moved into a bedroom and my study is a study again. Result! Pictures have been snapped and will be posted in due course. Today was spent putting the floor back into the bathroom, but this time with better screws and filler in the joins. I'll let that set while I paint tomorrow, before the tiling can begin.
Wednesday, 24 November 2010
November 24, 2010
We're making progress. We have primed all the drywall, and waterproofed the concrete areas around the tub. Need to let it all dry (which will happen while we are on holiday again) and next week we can start painting the walls and start the tiling too. So maybe only another two weeks at most before it's all complete.
Sunday, 21 November 2010
November 20, 2010
Much to report this time. We have completed drywalling the bathroom. At last I hear you say. But to be fair, that is one tough job. I can see now why it is one the most contracted out jobs in DIY. We are now onto probably the second most contracted out job, which is the plastering/mudding/spackling depending on where in the world you are. To me, it is the polyfillering in the gaps between the new wall boards. And I hate this part as much as I hated putting up the drywall in the first place. The other major improvement we have done is on the right hand side of the blog. We now have pictures. Yes you read that correctly. Pictures to go along with all the words. Now I don't have to write so much ('cos a pisha is worth a thousand words!)
Tuesday, 16 November 2010
November 16, 2010
In the move to the new site I lost the floorplan of the house. I have just worked out how to get it back again, so for those who haven't seen it, here it is again. The bit in red is the bathroom that all the work is being done on.
November 16, 2010
At last some progress to report. I have successfully put down the new "concrete" floor, and after some serious effort and thinking, I must say it looks rather good. We also started putting up the new ceiling and have gotten half way so far. Given that it is 2 person job, and 1 of them is working, the rest is going up tomorrow night. In the mean time, I plan to attempt putting up the walls and at least measuring and cutting the rest of the ceiling. We had a window company around today to give us a quote on replacing all the windows. 18K. Bit of a large pill to swallow. I am thinking I might put a "donate" button on the site, to raise funds. Yesterday I started the flooring as well as finishing changing the plugs and switches in the bedrooms. I did do some other work, but that effort can be found on my "good housekeeping" blog.
Sunday, 14 November 2010
November 14, 2010
Well I have managed to move the blog over to a proper blogging site, where you can and should leave comments. Seems reasonably easy to do. And if you see this message, I can even email my posts directly to the site. Cool no? I forgot to mention earlier that we ordered the new blinds for the bedrooms. They should arrive in a couple of weeks. We also had a message about the new sliding door for the bathroom. It supposedly arrived while we were in the UK. Unfortunately it arrived in many more pieces than is good for a glass door, so they have had to reorder it. It should arrive this week, so I can collect it along with our new cupboard doors and bedroom doors. (These are nothing fancy, just better than the ones we have now)